GKing Construction

Interior, Kitchen and Bathroom Remodeling Contractor


September 04, 2017

Interior remodeling with kitchen and bath remodel

Kitchen remodel

We fully remodeled this 800 sqft entire home in only 2 months. In order to remodel this property we had to do a LOT of work.

First we Demoed the original lath and plaster. Next we framed the house to the clients specifications which were to convert the home into a 2 bedroom 2 bathroom house. During the course of demo we discovered lots of termite damage on the rear wall from the foundation sill to the bottom of the wall studs. We replaced all of the damaged wood members and rebuilt the back wall.

Next we Framed in 5′ closets, two bathrooms, new doorways, a closet for stackable washers. We removed the galvanized water supply pipes and drains and plumbed it all up with new ABS & pex plumbing to the main just outside of the house.

All of the changes needed electrical upgrades as well, so we removed the old mixture of mc cable and knob and tube. Installed a new electric panel, all new wiring & fixtures.

We then hung new sheetrock, taped and textured the entire house with orange peel texture, Installed new laminate flooring, cabinets, quartz countertops, 2 panel doors and all new trim work throughout the house.

All-in-All, this was a major project involving a full kitchen remodel and two bathroom remodel that took around 2 months to complete.